Open side-bar Menu
 Aldec Design and Verification

Posts Tagged ‘individual system requirements’

Following the Roadmap to Successful Traceability

Monday, September 23rd, 2013

If DO-254 is both the mission and the map required to achieve compliance, then traceability represents the roads on that map. Consider this.

– Roads connect two or more places on a map; traceability connects two or more elements in a project (such as functions, requirements, concept, design, verification data and test results).

– Road names help identify specific places that are linked to it; traceability names help identify specific project elements that are linked to it.

– In the absence of roads, reaching your destination is practically impossible;  in the absence of traceability achieving compliance is also practically impossible.

(more…)




© 2024 Internet Business Systems, Inc.
670 Aberdeen Way, Milpitas, CA 95035
+1 (408) 882-6554 — Contact Us, or visit our other sites:
TechJobsCafe - Technical Jobs and Resumes EDACafe - Electronic Design Automation GISCafe - Geographical Information Services  MCADCafe - Mechanical Design and Engineering ShareCG - Share Computer Graphic (CG) Animation, 3D Art and 3D Models
  Privacy PolicyAdvertise