Microsemi Reports Record Second Quarter 2016 Results

 

Consolidated Condensed Balance Sheets

(unaudited, in millions)












Apr 3,
2016


Sep 27,
2015

Assets





Current assets





Cash and cash equivalents


$

153.1



$

256.4


Accounts receivable, net


211.9



186.9


Inventories


235.1



227.2


Deferred income taxes


26.2



26.2


Assets held for sale


163.0




Other current assets


54.3



39.9


  Total current assets


$

843.6



$

736.6


Property and equipment, net


180.5



152.7


Goodwill


2,428.8



1,139.3


Intangible assets, net


1,022.7



357.8


Deferred income taxes


35.4



26.8


Other assets


60.1



36.9


Total assets


$

4,571.1



$

2,450.1







Liabilities and stockholders' equity





Current liabilities





Accounts payable


$

101.5



$

82.3


Accrued liabilities


169.8



86.8


Current maturity of credit facility


16.9



32.5


Liabilities held for sale


9.0




  Total current liabilities


$

297.2



$

201.6


Credit facility


2,581.9



953.9


Deferred income taxes


41.1



41.1


Other long-term liabilities


109.4



46.3


Stockholders' equity


1,541.5



1,207.2


Total liabilities and stockholders' equity


$

4,571.1



$

2,450.1



« Previous Page 1 | 2 | 3 | 4 | 5 | 6 | 7  Next Page »



Review Article Be the first to review this article
Aldec

Featured Video
Editorial
Peggy AycinenaWhat Would Joe Do?
by Peggy Aycinena
Simon Davidmann: A re-energized Imperas Tutorial at DAC
More Editorial  
Jobs
LVS for PDK Design Engineer SILICON VALLEY for EDA Careers at San Jose, CA
LVS PEX DESIGN ENGINEERS SILICON VALLEY for EDA Careers at San Jose, CA
DDR 3-4-5 Developer with VIP for EDA Careers at San Jose, CA
Senior Front-End RTL Design AE for EDA Careers at San Jose, CA
Upcoming Events
11th International Conference on Verification and Evaluation of Computer and Communication Systems at 1455 DeMaisonneuve W. EV05.139 Montreal Quebec Canada - Aug 24 - 25, 2017
DVCon India 2017, Sept 14 - 15, 2017 at The Leela Palace Bengalore India - Sep 14 - 15, 2017
SMTA International 2017 at Rosemont IL - Sep 17 - 21, 2017
S2C: FPGA Base prototyping- Download white paper



Internet Business Systems © 2017 Internet Business Systems, Inc.
595 Millich Dr., Suite 216, Campbell, CA 95008
+1 (408)-337-6870 — Contact Us, or visit our other sites:
AECCafe - Architectural Design and Engineering TechJobsCafe - Technical Jobs and Resumes GISCafe - Geographical Information Services  MCADCafe - Mechanical Design and Engineering ShareCG - Share Computer Graphic (CG) Animation, 3D Art and 3D Models
  Privacy Policy