June 2013 Book-to-Bill Ratio (6 consecutive months above parity)

SAN JOSE, Calif. — July 18, 2013 — North America-based manufacturers of semiconductor equipment posted $1.33 billion in orders worldwide in June 2013 (three-month average basis) and a book-to-bill ratio of 1.10, according to the June EMDS Book-to-Bill Report published today by SEMI.   A book-to-bill of 1.10 means that $110 worth of orders were received for every $100 of product billed for the month.

The three-month average of worldwide bookings in June 2013 was $1.33 billion. The bookings figure is 0.7 percent higher than the final May 2013 level of $1.32 billion, and is 6.6 percent lower than the June 2012 order level of $1.42 billion.

The three-month average of worldwide billings in June 2013 was $1.21 billion. The billings figure is 1.4 percent lower than the final May 2013 level of $1.22 billion, and is 21.4 percent lower than the June 2012 billings level of $1.54 billion.

“The SEMI book-to-bill ratio has been above parity for six consecutive months and bookings in the quarter ending in June are 20 percent above the quarter ending in March,” said Denny McGuirk, president and CEO of SEMI.  "As recently announced, we anticipate that total worldwide equipment spending will decline by low single-digits this year and rebound with a double-digit growth rate in 2014.”

The SEMI book-to-bill is a ratio of three-month moving averages of worldwide bookings and billings for North American-based semiconductor equipment manufacturers. Billings and bookings figures are in millions of U.S. dollars.

 

Billings
(3-mo. avg)

Bookings
(3-mo. avg)

Book-to-Bill

January 2013

968.0

1,076.0

1.11

February 2013

974.7

1,073.5

1.10

March 2013

991.0

1,103.3

1.11

April 2013

1,086.3

1,173.9

1.08

May 2013 (final)

1,223.4

1,321.3

1.08

June 2013 (prelim)

1,206.8

1,329.9

1.10

Source: SEMI, July 2013

The data contained in this release were compiled by David Powell, Inc., an independent financial services firm, without audit, from data submitted directly by the participants. SEMI and David Powell, Inc. assume no responsibility for the accuracy of the underlying data.

The data are contained in a monthly Book-to-Bill Report published by SEMI. The report tracks billings and bookings worldwide of North American-headquartered manufacturers of equipment used to manufacture semiconductor devices, not billings and bookings of the chips themselves. The Book-to-Bill report is one of three reports included with the Equipment Market Data Subscription (EMDS).

SEMI is the global industry association serving the nano- and micro-electronic manufacturing supply chains. Our 1,900 member companies are the engine of the future, enabling smarter, faster and more economical products that improve our lives. Since 1970, SEMI has been committed to helping members grow more profitably, create new markets and meet common industry challenges. SEMI maintains offices in Bangalore, Beijing, Berlin, Brussels, Grenoble, Hsinchu, Moscow, San Jose, Seoul, Shanghai, Singapore, Tokyo, and Washington, D.C. For more information, visit  www.semi.org.

Notes
Next SEMI Book-to-Bill: August 20, 2013 at 3:00pm Pacific Daylight Time (PDT)
For information on SEAJ Book-to-Bill Report, visit  www.seaj.or.jp



Contact:

Dan Tracy
SEMI

Phone: 1.408.943.7987
Email:  Email Contact

Deborah Geiger
SEMI

Phone: 1.408.943.7988
Email:  Email Contact




Review Article Be the first to review this article
Featured Video
Editorial
Peggy AycinenaWhat Would Joe Do?
by Peggy Aycinena
Qualcomm’s Lu Dai: Energetic leadership for Accellera
More Editorial  
Jobs
Technical Support Engineer for EDA Careers at Freemont, CA
Development Engineer-WEB SKILLS +++ for EDA Careers at North Valley, CA
Sr. Staff Design SSD ASIC Engineer for Toshiba America Electronic Components. Inc. at San Jose, CA
SOC Logic Design Engineer for Global Foundaries at Santa Clara, CA
Principal Engineer FPGA Design for Intevac at Santa Clara, CA
Upcoming Events
IoT Summit 2017 at Great America ballroom, Santa Clara Convention Center Santa Clara CA - Mar 16 - 17, 2017
SNUG Silicon Valley 2017 at Santa Clara Convention Center Santa Clara CA - Mar 22 - 23, 2017
CDNLive Silicon Valley 2017 at Santa Clara Convention Center Santa Clara CA - Apr 11 - 12, 2017
10th Anniversary of Cyber-Physical Systems Week at Pittsburgh, PA, USA PA - Apr 18 - 21, 2017
TrueCircuits: IoTPLL



Internet Business Systems © 2017 Internet Business Systems, Inc.
595 Millich Dr., Suite 216, Campbell, CA 95008
+1 (408)-337-6870 — Contact Us, or visit our other sites:
AECCafe - Architectural Design and Engineering TechJobsCafe - Technical Jobs and Resumes GISCafe - Geographical Information Services  MCADCafe - Mechanical Design and Engineering ShareCG - Share Computer Graphic (CG) Animation, 3D Art and 3D Models
  Privacy Policy