First Rocket Parts of NASA's New Launch System Arrive in Florida

CAPE CANAVERAL, Fla., Nov. 4 /PRNewswire/ -- CAPE CANAVERAL, Fla., Nov. 4 /PRNewswire-USNewswire/ -- The first major flight hardware of the Ares I-X rocket has arrived in Florida to begin preparation for the inaugural test flight of the agency's next-generation launch system. The test flight is targeted for July 12, 2009.

(Logo: http://www.newscom.com/cgi-bin/prnh/20081007/38461LOGO)

The Ares I-X upper stage simulator traveled to Port Canaveral aboard the Delta Mariner, a ship that also transports the Delta IV rocket for United Launch Alliance. The journey began Oct. 22 on the Ohio River as the barge traveled toward the Mississippi River for its voyage to Port Canaveral. By Nov. 6, the flight hardware will have been moved off the barge into high bay 4 of the Vehicle Assembly Building at NASA's Kennedy Space Center.

The upper stage simulator consists of 11 individual components that were designed and manufactured during a two-year period at NASA's Glenn Research Center in Cleveland. The components represent the size, outer shape and weight of the second stage of the Ares I rocket, and will be integrated together in the Vehicle Assembly Building. The upper stage simulator eventually will be stacked atop the solid rocket booster segments of the Ares I-X rocket.

The Ares I-X test flight will provide NASA an early opportunity to test and prove hardware, facilities and ground operations associated with the Ares I crew launch vehicle. It also will allow NASA to gather critical data during ascent of the integrated Orion crew exploration vehicle and the Ares I rocket. The data will ensure the entire vehicle system is safe and fully operational before astronauts begin traveling to orbit.

On Nov. 6, video B-roll of the arrival activities will be available on NASA Television's Video File feed. For NASA TV streaming video, schedules and downlink information, visit:

http://www.nasa.gov/ntv

For more information about the Ares I-X and NASA's next-generation spacecraft, visit:

http://www.nasa.gov/ares

Web site: http://www.nasa.gov/




Review Article Be the first to review this article
Aldec

Downstream : Solutuions for Post processing PCB Designs

Featured Video
Jobs
Senior Electrical Engineer for Allen & Shariff Corporation at Pittsburgh, Pennsylvania
Upcoming Events
IEEE Women in Engineering International Leadership Conference at 150 W San Carlos St San Jose CA - May 21 - 22, 2018
SEMICON Southeast Asia 2018 at New Malaysia International Trade & Exhibition Centre (MITEC) Kuala Lumpur Malaysia - May 22 - 24, 2018
Methodics User Group Meeting at Maxim Integrated 160 Rio Robles San Jose CA - Jun 5 - 6, 2018
IEEE 5G World FOrum at 5101 Great America Parkway Santa Clara CA - Jul 9 - 11, 2018
DownStream: Solutions for Post Processing PCB Designs
Verific: SystemVerilog & VHDL Parsers
TrueCircuits: UltraPLL
DAC2018



Internet Business Systems © 2018 Internet Business Systems, Inc.
25 North 14th Steet, Suite 710, San Jose, CA 95112
+1 (408) 882-6554 — Contact Us, or visit our other sites:
AECCafe - Architectural Design and Engineering TechJobsCafe - Technical Jobs and Resumes GISCafe - Geographical Information Services  MCADCafe - Mechanical Design and Engineering ShareCG - Share Computer Graphic (CG) Animation, 3D Art and 3D Models
  Privacy PolicyAdvertise