Beijing Olympic TV Transmission Tower Designed with ArchiCAD

Budapest, August 8, 2008 – The Olympic TV Transmission Tower that will broadcast the signal of the Olympic Games to the world was designed by local Chinese architects in just three months to meet the final Olympic preparation rush.

Located near China’s National Stadium, better known as the “Bird’s Nest,” the transmission tower (4299 m2) stretches 132 meters high and is the tallest building in Beijing Olympic Park, making it one of three main landmark buildings in the Park.

After fierce competition for the project in 2007, the design work was won by Cui Kai, Fu Xiaoming, Kang Kai, Zhang Junying, architects of the Cui Kai Studio at the China Design Institute.

The project started in May of 2007 and was completed in July of the same year – a record three months time. The construction on the project was completed in July 2008 just before the start of the Olympic Games.

According to the architects, ArchiCAD’s integrated model based workflow was vital to the completion of the entire design and documentation work of the 4299 m2 (46,000 sq ft) building in such a short period of time.

About Graphisoft:

Graphisoft is the pioneer and leader in developing Virtual Building™ solutions. For 25 years, Graphisoft has been empowering the broadest community of architects to deliver model based projects that are better designed, more predictable to construct and less expensive to operate. Further media requests for information can be made to Akos Pfemeter at: Email Contact.

Graphisoft and ArchiCAD are registered trademarks of Graphisoft. All other trademarks are property of their respective owners.



Review Article Be the first to review this article
CST Webinar Series

EMA:

Featured Video
Editorial
Peggy AycinenaWhat Would Joe Do?
by Peggy Aycinena
Retail Therapy: Jump starting Black Friday
Peggy AycinenaIP Showcase
by Peggy Aycinena
REUSE 2016: Addressing the Four Freedoms
More Editorial  
Jobs
AE-APPS SUPPORT/TMM for EDA Careers at San Jose-SOCAL-AZ, CA
Manager, Field Applications Engineering for Real Intent at Sunnyvale, CA
Development Engineer-WEB SKILLS +++ for EDA Careers at North Valley, CA
FAE FIELD APPLICATIONS SAN DIEGO for EDA Careers at San Diego, CA
Upcoming Events
Zuken Innovation World 2017, April 24 - 26, 2017, Hilton Head Marriott Resort & Spa in Hilton Head Island, SC at Hilton Head Marriott Resort & Spa Hilton Head Island NC - Apr 24 - 26, 2017
CST Webinar Series



Internet Business Systems © 2016 Internet Business Systems, Inc.
595 Millich Dr., Suite 216, Campbell, CA 95008
+1 (408)-337-6870 — Contact Us, or visit our other sites:
AECCafe - Architectural Design and Engineering TechJobsCafe - Technical Jobs and Resumes GISCafe - Geographical Information Services  MCADCafe - Mechanical Design and Engineering ShareCG - Share Computer Graphic (CG) Animation, 3D Art and 3D Models
  Privacy Policy